Projects
Darling Harbour Passenger Terminal Gantry
Client Reference Number(s): P122 · Completed: 10/02
Description
Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.
Sewage Treatment Plant SCADA Upgrade
Client Reference Number(s): P122 · Completed: 10/02
Description
Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.
Singleton Abattoir Carton Lidding and Accumulator
Client Reference Number(s): P122 · Completed: 10/02
Description
Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.
Primo Turn-o-Matic & Dehairing Machines
Client Reference Number(s): P122 · Completed: 10/02
Description
Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.
Grasstrees Mine Stage and Kibble Winder
Client Reference Number(s): P122 · Completed: 10/02
Description
Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.
Clinical Waste Treatment Plant
Client Reference Number(s): P122 · Completed: 10/02
Description
Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.
Geocast-Trenching Machine Software Upgrade
Client Reference Number(s): P138 · Completed: 11/01
Description
Design , install and commission of an automation system for a trenching machine, called Geocast. The trenching machine is able to dig trenches up to 6m deep by 300mm wide. Concurrently with digging the machine is able to cast a concrete wall so that digging and concreting are done in one operation. The machine uses an auto guidance and control system. The control system designed uses
- Magelis XBT terminal.
- Modicon TSX57 PLC
- Hand Held radio controls
Olympic Overflow Park
Client Reference Number(s): P146 · Completed: 9/01
Description
The Overflow park in Sydney Olympic Park is the relocation site for the Sydney 2000 Olympic Games Cauldron. ControlTec designed, installed and commissioned the control for the water, lights and flame operation for the Cauldron. The control used html pages to control a Modicon PLC, via a Laptop, which was connected via a radio LAN link, to enable remote control of the Cauldron.
Olympic Games Cauldron Control System
Client Reference Number(s): P069 · Completed: 9/02
Description
ControlTec was involved with the Design, installation and operation of the Modicon TSX control system for controlling the lighting of the Sydney 2000 Olympic Games Cauldron for the opening ceremony. The control system used
- Telemechanique Magelis Display Unit
- Modicon TSX Premium PLC (x2)
- Modicon TSX Micro PLC
Wallerawang Power Station Truck and Coal Monitoring
Client Reference Number(s): P078 · Completed: 11/00
Description
Design install and commissioning of a Truck and Coal monitoring and Handling system for Wallerawang Power Station. The system is an automatic computerised system which monitors the arrival and departure of coal transport trucks in and out of the power stations coal plant. The system also samples the coal for the purpose of third party analysis to determine the properties of the coal. Control Equipment used
- Modicon Quantum PLC
- Citect SCADA system with a link to Access Database
Berri Cordial and Cup Line
Client Reference Number(s): P082 · Completed: 4/00
Description
Design, install and commissioning of the Berri Cordial and Cup line, and Batching plant. Design used Allen Bradley PLC with Panel Builder 1400 SCADA program.
Cannington Mine Winder Control System
Client Reference Number(s): P011; P021 · Completed: 8/97
Description
Cannington Coalmine, shaft one stage winder was repositioned to the second shaft of the same mine. The stage winder was then recommissioned with particular focus on the control system. Project was undertaken for Peabody.
The Rig Seismic- Coring and Hydrographics Winder
Client Reference Number(s): P009 · Completed: 10/96
Description
Design, install manufacture and delivery of a Winch Control System for a Coring and Hydrographic Winder on board a ship. The control system includes and industrial computer, Man Machine Interface, Telemechanique TSX 37 PLC.
HMAS Westralia Fuelling Winches
Client Reference Number(s): P006 · Completed: 08/96
Description
Design, Installation and commission of control system for winches for refueling HMAS Westralia.
Penrith STP SCADA
Client Reference Number(s): P033 · Completed: 11/99
Description
Design install and commissioning of an Automation and SCADA system for Penrith Sewerage Treatment Plant. Control Equipment used
- Square D Model 400 PLC
- Citect SCADA